Tenaris has entered the construction phase of its second wind farm in Olavarría, Argentina, known as La Rinconada. This new facility will feature 21 wind turbines with a total installed capacity of 94.5 megawatts.
Tenaris has delivered a 2 7/8" BlueCoil® string for Cudd Pressure Control, marking the first time the company’s proprietary heat-treated coiled tubing is manufactured in this larger diameter to meet the demands of the US shale market.
Tenaris has announced the construction of a new service center in Northeastern British Columbia in Canada. The facility will support drilling operations of key oil and gas customers in the Montney formation.
Two strings with Dopeless® technology were successfully installed in the Búzios offshore field, operated by Petrobras in Brazil’s Pre-Salt region, marking the first use of Tenaris’s dope-free solution for large-diameter connectors.
Tenaris has certified an Environmental Product Declaration (EPD) for its seamless steel pipes, reinforcing its commitment to transparency and sustainability across its global operations.
Tenaris was present at the Asia Pacific Energy Capital Assembly 2025, a major industry event this week in Singapore. The two-day forum brought together over 500 executives and energy leaders to shape the region’s energy future.
Luca Zanotti, Tenaris US President, and Guillermo Moreno, Chief Commercial Officer for the US, received the award on behalf of Tenaris. Tenaris