Tenaris has successfully run a 26” casing string of TenarisHydril DesertDock™ weld-on connector in an exploratory well located in the Tarija department of Bolivia.
In collaboration with the National Institute of Anthropology and History (INAH) in Veracruz, Mexico, Tenaris is supporting the digitization of thousands of archaeological pieces, opening access to a broader audience.
More than two decades ago, Tenaris achieved a milestone in the energy industry by successfully conducting the first commercial trial of Dopeless® technology in the North Sea on July 15, 2003.
Tenaris’s Bay City, Texas, plant has received Leadership in Energy and Environmental Design (LEED) certification – the first pipe manufacturing facility in the United States to achieve this designation.
Tenaris is supplying Fluxys with 500 tons of pipes and One Line™ coating service for onshore hydrogen/gas interconnecting lines.
Having grown up in Johor Bahru, Malaysia, Ryan Yip Chuen Keat had always dreamed of joining a multinational company in the oil and gas industry and living in another country. With a major in Chemical Engineering, graduated from University of Malaya - the top 1 university in Malaysia- he was determined to find a job that would allow him to work and study overseas and was on the lookout for management training programs.
Luca Zanotti, Tenaris US President, and Guillermo Moreno, Chief Commercial Officer for the US, received the award on behalf of Tenaris. Tenaris