Lifelong dedication
As fields enter into their mature stage, typically several wells are drilled in the same area in order to maintain the level of production. At the same time, water injection is employed to stimulate their production, resulting in increased risk of corrosion, jeopardizing the equipment’s integrity, generating higher operational costs and loss of profitability. In the secondary and tertiary production phases, cost-effective solutions are a top priority. Our products for mature fields provide reliable performance, helping to extend the life of the well.