Tenaris highlighted its latest coiled tubing solutions at the 2025 SPE/ICoTA Well Intervention Conference and Exhibition, held March 25-26 at the Woodlands Waterway Marriott Hotel and Convention Center in The Woodlands, Texas.
Tenaris is funding the establishment of the Mississippi River Steel Partners Emergency Medical Services, including an ambulance and clinic located across from Tenaris’s Hickman welded pipe mill in Blytheville, Arkansas.
Felix Koshy, Stocker & Visual Inspector at Tenaris’s seamless and welded steel pipe mill in Sault Ste. Marie, Canada, brings precision and attention to detail to everything he does, from his role in the mill to his passion for art.
Following a $110 million USD investment, Tenaris is strengthening its hydraulic fracturing capabilities in Argentina with the addition of a third frac set for Vaca Muerta, one of the world’s largest shale gas reservoirs.
Dalmine, Tenaris’s seamless steel pipe mill in Italy, has completed the qualification process, obtaining accreditation for the supply of certified materials intended for the construction of nuclear facilities designed according to the ASME III standard.
Luca Zanotti, Tenaris President for the US, shared Tenaris’s strong domestic positioning, during the panel discussion titled “US Oil and Gas: How to grow by 3 million boe?” at CERAWeek 2025.
Luca Zanotti, Tenaris US President, and Guillermo Moreno, Chief Commercial Officer for the US, received the award on behalf of Tenaris. Tenaris